Home renovation
Layout, wet rooms, floors and wiring get settled before the crew starts, and they set the price more than the finishes do. From AED 15,000. Free quote. Tell us what you want changed and we reply on WhatsApp.
By Stefan Dahl, Corvana research · Updated
The decisions
What does a home renovation in Dubai involve?
A search for "home renovation services dubai" ends at a crew, but the job starts as a chain of decisions, and the crew only does the last links. Settle the layout, the wet rooms and the wiring while the walls are still open. Check what the building and the authority must approve. Then put the rooms in an order that does not undo the work already finished. We renovate homes from AED 15,000 and build that chain into the job, so you bring the plan and the budget, and we bring the sequence and the price.
Whoever typed "home renovation services dubai" into a search box still has four decisions to make first: where the walls stand, where the water goes, what the floors sit on, and what the electrical load can carry. Finishes come after them. A tile in the wrong place costs little to change on a drawing and a great deal once the wall is closed.
Write the four down before you ask anyone for a price. A quote built on an open question is a guess with a total attached, and the guess usually shows up later as a line that says subject to survey. Settle the questions first, and the quotes you receive can be compared on the same work.
The floor is the decision people treat as cosmetic. It sits on a screed that may be sound or may need levelling, and the height of the new finish decides which doors still clear and whether the skirting survives. Settle the finished floor height on paper before the first tile is ordered, because every other height in the flat is measured from it.
The electrical load is the decision most homes get wrong. Sockets and lighting are cheap to add while the walls are open and expensive to add after paint. Mark where the kitchen appliances, the air conditioning and any home office will draw power, and ask the electrician to check the supply against that list rather than against the sockets that happen to exist today.
Moving a kitchen means new drainage, a new supply line and often a new ceiling detail, so it prices as a different job from a refit on the same spot. Keep the kitchen where the plumbing already runs and most of the budget goes into cabinetry, worktops and appliances. Move it, and the question becomes whether the building allows the change at all.
Walls are the other half of the layout question. A wall that carries load, or one that holds a shared riser, is not a decision made in the living room. The wall guide explains how to tell the two apart, and the open-kitchen guide walks through the most common move in a flat.
Living rooms follow the same logic. Opening two rooms into one is a bigger job than it looks, because the doors, the ceiling and the electrical runs all change with it. Draw the new room with its furniture before anyone quotes it. The furniture decides where the sockets go, and sockets are where the wiring budget disappears.
Pipes are the slowest thing to change. A bathroom that keeps its drain line can be stripped, retiled and refitted in a tight window. A bathroom that moves needs its floor opened, its waterproofing redone and its fall rebuilt, and that work cannot be hurried without a leak appearing later.
Ask for the drain positions from the existing drawings, not from memory of the flat. In a tower, the riser that serves the unit above often settles the question, so a good quote names which risers were checked on site and which were assumed. The assumed ones are where the variations start.
Laundry follows the same rule. A washing machine that moves to a new wall needs a supply and a drain, and both have to meet a stack that already exists. Keep the laundry where the water already arrives, and it stays a small job.
Most surprises sit behind paint and tile: old cable that no longer suits the load a new kitchen will carry, a balcony drain that has run slow for years, a slab that has to be opened to reach a pipe. Each one is cheap to find before the price is fixed and expensive to find after the first wall is closed.
We build the sequence into the brief before the work is priced. Known risks go in writing with their cost. Anything found after the start is shown to you with a photo and a price before the crew carries on, and nothing is added to the job without your approval.
A quote with no line for hidden works is not cheaper. It has moved the risk onto you, and you find out which risk it was when the first wall comes down.
Between visits, walk the flat yourself once a week with the drawings in hand. Look for new cracks at the ceiling joints, damp patches under the bathroom, and any pipe or cable that has been covered without a photo. A short message with a picture, sent the same day, lets the crew fix a small thing while it is still small.
Start with the work that makes the most mess and touches the most walls: demolition, then plumbing and electrics, then the wet-room waterproofing. Those stages need access to the bare structure, so they come first. Once the walls are closed and tested, plaster and screed follow, then tiles, then paint.
Paint, doors, fittings and the final clean come last, once the dust has settled. The living room often goes last of all, because it becomes the store for materials and the place where dust travels from the rest of the flat. Keep one bathroom usable for as long as possible, so the household keeps a working room while the others are opened.
Big deliveries belong on the days the building's lift and loading access are free. Book them with the building manager in writing, and ask the crew to share a delivery calendar so no kitchen unit waits in a corridor for a week.
Often, and the answer changes between buildings. Painting, simple upkeep and like-for-like fittings are the usual exceptions. Beyond them, the building's management may want its own consent first, and the authority wants its permit only where the work changes structure or floor area. Two buildings on the same street can answer differently, so the answer comes from the manager and the plot, not from a neighbour.
We handle the building consent as part of the job and tell you which approvals apply before the price is fixed. Check this before the design is final, because a change to the layout after consent can restart the file. The permit guide sets out who files what, and the building NOC guide covers the consent that comes first in most towers.
Keep every approval and entry permit in one folder with the drawings. That folder is what the building's inspector, and any future buyer, will ask to see.
Compare them line by line, not by the bottom figure. Check that both name the same rooms, the same finishes, the same wet-room positions and the same exclusions. A lower total usually means a smaller scope, a missing line for hidden works, or a building fee left out. Each of these tends to show up after the first wall is opened.
Ask each contractor to name the building fees they have assumed and who pays them. Ask for the programme too: which stage comes first, how long each one takes, and which days the crew needs building access. A quote without a programme is a price for an unknown amount of time.
Our quote follows that structure line by line, so the comparison stays on the work. Send us the plan, the room list and the building name, and we reply on WhatsApp with a written price and the sequence it depends on. Start with the four decisions, and apartment renovation is where the priced job begins.
Tower or building, unit size and what you want changed. We come back on WhatsApp with a written price.